The weather has been awful, with rain much of the time. That is a setback for the hives because the bees can get out and forage, and with all the bees in the hive and in a lame mood, it is a bad time to check the hives. So, I’m about 3 weeks behind in my inspections. I hope to be doing inspections tomorrow.
With a little luck, I’ll set my camera up on the tripod and try to get dsome new pictures from this year’s inspections.
In the meantime, I found a few pics from an inspection at one of our locations last year. Pics came out well! Enjoy!










